Peel seal is the original self stick roll roofing specifically designed for low slope residential and commercial applications.
Peel and seal on top of shingle roofing installation.
Once you ve reached the ridge bend the shingle over the ridge so that each side is equal and nail it into place with a single nail on each side.
Installing peel and stick roll roofing on a flat roof requires a minimum slope of 1 2 inch per 12 inch roof run.
Do the same with the next shingle continuing this step until you get to the far edge of the ridge.
Typically a flat roof is a low sloping roof with a maximum 10 degrees of pitch or usually having a slope of up to 3 inches per linear foot for adequate drainage.
Mfm wind water seal mfm wind water seal low temperature peel seal peel seal spanish premium ht tile metal ridgeseal roof deck tape seal coat eifs shinglestarter stormstopper fsu subseal 40 and subseal 60 ultra ht wind water seal ultra ht wind water seal low temperature windowwrap products.
Peel seal mfm building products corp.
Peel seal should be installed parallel to the slope of the roof.
Mfm recommends using two installers when using peel seal as a whole roof covering.
Cut your last shingle on each row to size repeating all the way to the ridge.
Installation should begin at the low point of the roof and proceed up the slopeshingle fashion so water does not flow against the laps.